South Upper Truckee Well Controls Building and Treatment Facility
4 Documents in Project
Summary
SCH Number
2007052110
Lead Agency
South Tahoe Public Utility District
Document Title
South Upper Truckee Well Controls Building and Treatment Facility
Document Type
NOD - Notice of Determination
Received
Posted
7/9/2007
Present Land Use
TRPA Regional Plan Zoning: Single Family Residential, Resource Management, Recreation, Public Service
Document Description
A well controls building and treatment facility will be constructed that will house mechanical and electrical controls, a corrosion control treatment and disinfectant equipment required for the operation of a proposed 1,400 gallon per minute municipal drinking water supply well. This will replace two existing municipal water supply wells operated at the site.
Contact Information
Name
Ivo Bergsohn
Agency Name
South Tahoe Public Utility District
Contact Types
Lead/Public Agency
Phone
Location
Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
South Upper Truckee Road
Zip
96150
Parcel #
036-581-01
State Highways
SR 89, Highway 50
Airports
Lake Tahoe Airport
Schools
Lake Tahoe Environmental Education School and South Tahoe HS
Waterways
Upper Truckee River
Township
11N
Range
18E
Section
18,19
Other Location Info
City/Nearest Community: Meyers
Notice of Determination
Approving Agency
South Tahoe Public Utility District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.