SFPUC’s San Joaquin Pipeline Valve and Safety Improvements: Phase 3 - Tesla Surge Tower Project

8 Documents in Project

Summary

SCH Number
2007052109
Lead Agency
City and County of San Francisco
Document Title
SFPUC’s San Joaquin Pipeline Valve and Safety Improvements: Phase 3 - Tesla Surge Tower Project
Document Type
NOD - Notice of Determination
Received
Posted
7/30/2024
Document Description
Project activities consist of constructing the following facilities at the Tesla Portal site: A new surge shaft pipeline that extends from the Tesla Treatment Facility inlet pipe to the new surge shaft. A new water recirculation system to address stagnant water inside the new surge pipeline. A new surge shaft with a concrete base and apron for support of the structure and for directing overflows to the new spillway. A new concrete spillway channel that connects to the existing spillway at the Tesla Treatment Facility. A new gravel access road parallel to the new pipeline and replace two culverts and perform drainage improvements within the project footprint.

Contact Information

Name
Sara Gevorgyan
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
San Joaquin
Regions
Northern California
Other Location Info
9000 Vernalis Road

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
https://ceqanet.opr.ca.gov/Project/2007052109

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print