San Joaquin Pipeline Valve and Safe Entry Improvements Phase 3 Tesla Surge Tower Project (Streambed Alteration Agreement No. EPIMS-SJN-44298-R3)

7 Documents in Project

Summary

SCH Number
2007052109
Lead Agency
City and County of San Francisco
Document Title
San Joaquin Pipeline Valve and Safe Entry Improvements Phase 3 Tesla Surge Tower Project (Streambed Alteration Agreement No. EPIMS-SJN-44298-R3)
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2024
Document Description
The project will construct the following facilities at the Tesla Portal site: new surge shaft pipeline that extends from the Tesla Treatment Facility inlet pipe to the new surge shaft; new water recirculation system to address stagnant water inside the new surge pipeline; new surge shaft with a concrete base and apron for support of the structure and for directing overflows to the new spillway; new concrete spillway channel that connects to the existing spillway at the Tesla Treatment Facility; new gravel access road parallel to the new pipeline; and replacement of two culverts.

Contact Information

Name
Sabrina Dunn
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
unincorporated area
Counties
San Joaquin
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located on an unnamed drainage at the SFPUC Tesla Portal site, which is located approximately 7.5 miles south of the City of Tracy, in unincorporated southwestern San Joaquin County, State of California; Latitude [37.63490], Longitude [-121.417516].

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerks
San Francisco, San Joaquin
Final Environmental Document Available at
2825 Cordelia Road, Suite 100, Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print