Cowell Student Health Center Renovation and Expansion
3 Documents in Project
Summary
SCH Number
2007052063
Lead Agency
University of California Santa Cruz
Document Title
Cowell Student Health Center Renovation and Expansion
Document Type
NOD - Notice of Determination
Received
Posted
1/17/2008
Present Land Use
Campus Core (UC Santa Cruz 1988 Long Range Development Plan)
Document Description
The proposed project would renovate the existing 25,000 gross square foot (gsf) Cowell Student Health Center (CSHC) on the UC Santa Cruz campus and construct a 10,000 gsf addition to the facility. The CSHC houses the UC Santa Cruz Student Health Services, which provides outpatient medical services, and a health promotion and outreach program for UC Santa Cruz students. The facility also includes a clinical laboratory, a diagnostic X-ray service and a full-service pharmacy. Approximately 900 square feet of the existing north wing will be demolished and replaced with a new main entrance, lobby, and elevator. A new American Disability Act (ADA) accessible pedestrian pathway will be constructed north of the existing facility to provide access to the new main entrance. A second-story walkway would provide access from the lobby to the building addition. The CSHC is located in the central portion of the UC Santa Cruz main campus, on the south side of McLaughlin Drive, a main east-west campus road.
Contact Information
Name
John E. Zimmermann
Agency Name
University of California
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
McLaughlin Drive and Chinquapin Road
Zip
95064
Total Acres
0.5
Parcel #
01-011-13
State Highways
1, 9, 17
Railways
UPRR
Schools
University of California, Santa Cruz
Waterways
San Lorenzo River
Township
11S
Range
2W
Section
Unsect
Base
MDB&M
Notice of Determination
Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.