DS Canal Flume and Gracie Road Crossing Replacement
6 Documents in Project
Summary
SCH Number
2007052046
Lead Agency
Nevada Irrigation District
Document Title
DS Canal Flume and Gracie Road Crossing Replacement
Document Type
NOD - Notice of Determination
Received
Posted
10/8/2009
Document Description
This proposed project consists of the replacement of 8 existing elevated wood-supported metal flumes along the Nevada Irrigation District DS Canal with Steel supported elevated 72 inch pipe flumes, and replacement of an existing culvert at Gracie Rd. The existing flumes connect the DS Canal, where it spans natural drainages, to provide gravity flow along the course of the canal. The flumes proposed for replacement are generally located between the DS Canal's intersections with Banner Mountain Trail (to the east) and Banner Lava Cap Rd (to the west). Flumes #13 and #19 is proposed to be replaced in its current alignment, requiring a temporary canal outage while construction takes place. Construction of Flumes #13 and #19 would occur during the non-irrigation season. Flumes #14, 15, 16, 17, 18, and 23 would be built parallel to the existing facilities and will require brief canal outages while being reconnected to the canal.
Contact Information
Name
Tonia M. Tabucchi Herrera
Agency Name
Nevada County Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Grass Valley
Counties
Nevada
Cross Streets
Banner Mountain Trail and Banner Mountain West
State Highways
SR 174
Waterways
Deer Creek and Wolf Creek
Notice of Determination
Approving Agency
Nevada Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.