TPM 20938, Log No. 05-08-012; El Montevideo Tentative Parcel Map

2 Documents in Project

Summary

SCH Number
2007051152
Lead Agency
San Diego County
Document Title
TPM 20938, Log No. 05-08-012; El Montevideo Tentative Parcel Map
Document Type
NOD - Notice of Determination
Received
Posted
8/6/2007
Present Land Use
Existing single family residence (to remain) with a lemon orchard.
Document Description
The proposed project is a minor residential subdivision within the San Dieguito Community Planning Area. The project proposes to divide 17.71 acres into 3 parcels measuring 5.4 acres, 7.88 acres, and 3.95 acres. An existing single-family residence is located on proposed parcel 1 and will remain. The project is subject to the Regional Land Use Element 2.4 (EDA) Estate Development Area and General Plan Land Use Designation (17) Estate Residential, which permits 0.5 dwelling units per acre. The current zone for the property is RR.5, which requires a minimum lot size of 2 acres.

Contact Information

Name
Jarrett Ramaiya
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Via De Fortuna
Total Acres
17.71
Parcel #
265-130-61-00
Schools
Yes
Waterways
San Dieguito River
Base
SBB&M
Other Location Info
Community: San Dieguito

Notice of Determination

Approving Agency
San Diego County Department of Planning and Land Use
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print