PXP Arroyo Grande Produced Water Project Outfall Structure, Agreement 2009-0002-R4

5 Documents in Project

Summary

SCH Number
2007051143
Lead Agency
San Luis Obispo County
Document Title
PXP Arroyo Grande Produced Water Project Outfall Structure, Agreement 2009-0002-R4
Document Type
NOD - Notice of Determination
Received
Posted
2/13/2009
Document Description
The CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Mr. John Westenberger. The proposed Project would consist of adding an outfall structure to existing rock slope protection (RSP) along the right bank (looking downstream) of Pismo Creek. The discharge would consist of installing a 25 ft long steel perforated pipe and deflector system supported on short piers constructed among the existing RSP. Water would seep from the perforated pipe into a semicircular shroud below the pipe and flow into the rock slope protection. Treated water piped to the site would be discharged at a rate of ~0.3 cubic feet per minute at the site. If necessary, grout would be added among the RSP for stabilization. Minor vegetation clearing would occur to allow access to the site.

Contact Information

Name
Mike Hill
Agency Name
California Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Pismo Beach
Counties
San Luis Obispo
Cross Streets
Ormonde Road
Zip
93401
Total Acres
1,480
Parcel #
044-201-002
State Highways
101 and 227
Railways
Yes
Waterways
Pismo Creek

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print