Mira Mesa/Scripps Ranch Direct Access Ramp

5 Documents in Project

Summary

SCH Number
2007051137
Lead Agency
California Department of Transportation, District 11
Document Title
Mira Mesa/Scripps Ranch Direct Access Ramp
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2009
Document Description
The project proposes to construct a Direct Access Ramp (DAR) to connect the Interstate 15 (I-15) Managed Lanes facility with the local street system and transit failities in the Mira Mesa and Scripps Miramar Ranch communities on I-15; in San Diego County from 385 meters (m: 1,265 ft) north of the Carrol Canyon Road Overcrossing to 960 m (3, 150 ft) north of the Mira Mesa Boulevard Undercrossing. Within the Project limits, I-15 consists of a 10- to 11-lane freeway with 3.6-m (12 ft) wide travel lanes, 3.0-m (10ft) wide shoulders, and auxiliary lanes approaching the Mira Mesa Blvd and Carrol Canyon Road off-ramps. The center median consists of a reversible HOV lane facility, which is comprised of 2 3.6-m (12 ft) wide travel lanes and a 3.2-m (10.5 ft) wide shoulder on each side. Upon completion of the I-15 Managed Lanes project, which is currently under construction, the existing two-lane HOV facility will be replaced with a four-lane Managed Lanes facility in the center median with intermediate access points.

Contact Information

Name
David Nagy
Agency Name
California Department of Transportation, District 11
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Carroll Canyon Road/Mira Mesa Boulevard
Zip
92126, 131
State Highways
I-15
Airports
1
Schools
4
Other Location Info
City/ Nearest Community: Mira Mesa/Scripps Ranch

Notice of Determination

Approving Agency
Department of Transportation-District 11
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print