23641 Pacific Coast Highway
3 Documents in Project
Summary
SCH Number
2007051057
Lead Agency
City of Malibu
Document Title
23641 Pacific Coast Highway
Document Type
NOD - Notice of Determination
Received
Posted
9/4/2007
Present Land Use
Commercial
Document Description
The subject application proposes to remodel the existing Malibu Lumber Yard and Hardware Store as new retail and restaurant uses. The project would remodel these structures, allocating approximately 30,331 square feet to new retail areas and two, new restaurants and accessory development restaurant uses. The subject parcel would not increase existing floor-area ratio (basements are exempt from floor area ratio pursuant to Malibu Municipal Code Section 17.02.060). Existing total structure heights would not change from present. The project proposes to replace much of the existing, impermeable surfacing of the property (including concrete and related hardscape) with new, permeable surfaces such as additional landscaping. The project proposes 120 onsite parking spaces as well as to provide valet service. The project will utilize an alternative onsite wastewater treatment system (AOWTS) providing primary, secondary, and tertiary treatment. A conditional use permit (CUP) is required in order to permit restaurant facilities, as well as for the sale and serving of alcohol in the CG zoning district.
Contact Information
Name
Stacey Rice
Agency Name
City of Malibu
Contact Types
Lead/Public Agency
Phone
Location
Cities
Malibu
Counties
Los Angeles
Cross Streets
Cross Creek Road and Pacific Coast Highway
Zip
90265
Parcel #
4458-020-016
State Highways
PCH
Schools
McEwen HS
Waterways
Malibu Lagoon/Creek
Notice of Determination
Approving Agency
City of Malibu
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.