SR-58 Kramer Junction Realignment Project (California Endangered Species Act Incidental Take Permit No. 2081-2016-004-06 (ITP))

6 Documents in Project

Summary

SCH Number
2007051051
Lead Agency
California Department of Transportation, District 8
Document Title
SR-58 Kramer Junction Realignment Project (California Endangered Species Act Incidental Take Permit No. 2081-2016-004-06 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
10/9/2017
Present Land Use
Transportation, Resource Conservation, Rural Living
Document Description
Project would improve this section of SR-58 to conform to the previously accomplished 4-lane sections. The upgrade of the existing two-lane section of SR 58 will be accomplished by expanding it into a 4-lane expressway, from the Kern County Line to 7.5 mi east of US395 KP 0 to 20.76 (PM 0 to 12.9). The improvements would add a second expressway travel lane to both directions of travel up to 12.9 mi long. The work will also include the construction of an access controlled new northerly alignment, joining existing SR58 at KP 5.59 (PM 9.0), a railroad grade separation (overhead), and a spread diamond interchange (separation) at the intersection of SR58 and US 395. This proposed diamond interchange with US 395 would be located approx. one third of a mile north of the existing junction. Project will result in impacts 419.76 acres of Desert tortoise (Gopherus agassizii) and Mohave ground squirrel (Xerospermophilus mohavensis) habitat. The project is expected to result in incidental take of desert tortoise and Mohave ground squirrel, which are designated as a threatened species under the CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information

Name
Heather Elder
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Barstow
Counties
San Bernardino
Cross Streets
SR-58/US-395
Zip
93516
Total Acres
300
Parcel #
Transportation Right of Way
State Highways
SR-58, US-395
Railways
BNSF
Airports
Boron Airstrip
Schools
Boron Jr-Sr HS
Other Location Info
Boron

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print