Reynolds and Brown Plaza III

4 Documents in Project

Summary

SCH Number
2007042125
Lead Agency
City of Elk Grove
Document Title
Reynolds and Brown Plaza III
Document Type
NOD - Notice of Determination
Received
Posted
7/25/2008
Present Land Use
Zoning: RD-5 (Low Density Residential 5 du/acre) General Plan: Public/Quasi Public
Document Description
The Reynolds and Brown Plaza III project proposes the development of a commercial plaza with a 98 room hotel and three retail buildings on a 4-acre site. The site is currently developed as a Caltrans Maintenance Facility which is no longer in operation. This project consists of a General Plan Amendment to amend the General Plan land use designation from Public/Quasi Public to Commercial; a Rezone from Residential-Five units per acre (RD-5) to Shopping Center Commercial (SC); and a Tentative Parcel Map to create four commercial lots; a Design Review for a hotel and a three building retail plaza; a Variance to the development standards for a reduction of building setbacks; and a Uniform Sign Program for the project.

Contact Information

Name
Nina Stevens
Agency Name
City of Elk Grove Planning
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
9603-9641 East Stockton Boulevard (SR 99, Elk Grove Boulevard, East Stockton Boulevard)
Zip
95624
Total Acres
4.014
Parcel #
125-0030-029
State Highways
99
Schools
Ellen Feickert ES, Joseph Kerr MS, Elk Grove HS
Waterways
Man-made drainage ditches only
Township
6N
Range
5E
Section
1
Base
MDB&M

Notice of Determination

Approving Agency
Elk Grove City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print