Chico Groundwater- Central Plume

4 Documents in Project

Summary

SCH Number
2007042103
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Chico Groundwater- Central Plume
Document Type
NOD - Notice of Determination
Received
Posted
1/7/2014
Document Description
The proposed project will construct, install and operate two extraction wells (CMW-119B and CMW-18B1) and one irrigation well (CMW-126B); conveyance piping from each extraction well and connecting piping to the existing groundwater treatment system. A monitoring well (CMW-128B) will also be constructed down gradient from well CMW-106B. Well CMW-118B1 is proposed for installation in the eastern portion of the Flair Source Area. Well CMW 119B is proposed for installation down gradient of the Flair Source Area and the well CMW-126 is proposed for installation on the leading edge of the plume. Each well will be screened within the intermediate Zone Aquifer (IZA).

Contact Information

Name
Reese Crenshaw
Agency Name
CA Dept. of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Chico
Counties
Butte
Cross Streets
Mangrove Avenue and Vallombrosa Avenue
Zip
95926
Total Acres
600
Parcel #
32-0123-02
State Highways
99
Railways
SPRR
Airports
Chico Municipal
Schools
Chico State, Chico HS, Chico JHS
Waterways
Big Chico Creek
Township
22N
Range
1E
Section
26
Base
MDBM

Notice of Determination

Approving Agency
CA Dept. of Public
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No