Elk Grove Boulevard/SR 99 Interchange Modification Project

6 Documents in Project

Summary

SCH Number
2007042101
Lead Agency
City of Elk Grove
Document Title
Elk Grove Boulevard/SR 99 Interchange Modification Project
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2009
Document Description
The Project proposes to modify the existing Elk Grove Boulevard/SR99 interchange by adding a northbound on-ramp to State Route 99 from East Stockton Boulevard through Caltrans right-of-way, eliminating left turns and the traffic signal on Elk Grove Boulevard at the existing northbound on-ramp, widening the northbound off-ramp, adding a traffic signal at the northbound ramp intersection on East Stockton Boulevard, and modifying the southbound on-ramp intersection to provide two left turn lanes to the on-ramp. The overall objective of the Project is to reduce congestion on Elk Grove Boulevard through the ramp intersections, along with improving traffic flow and operational safety.

Contact Information

Name
Taro Echiburu
Agency Name
City of Elk Grove
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
SR 99, West Stockton Boulevard / East Stockton Boulevard
Zip
95758
Total Acres
3.0
Parcel #
Various
State Highways
99
Railways
UPRR
Airports
Mo
Schools
Eleven
Waterways
Elk Grove Creek, Laguna Creek
Township
6N
Range
5E
Section
1
Base
MDBM

Notice of Determination

Approving Agency
City of Elk Grove
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print