Tuolomne City Sanitary District Wastewater Treatment and Water Reuse Facilities Improvement Project

3 Documents in Project

Summary

SCH Number
2007042088
Lead Agency
Tuolumne City Sanitary District
Document Title
Tuolomne City Sanitary District Wastewater Treatment and Water Reuse Facilities Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/11/2008
Present Land Use
WWTF = Residential Agricultural; Public Service; Parks and Recreation and Commercial Recreation. Baker Ranch = Exclusive Agriculture. Pipeline = General Agriculture.
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant Tuolumne City Sanitary District, represented by Harold Welborn, for its Wastewater Treatment Facilities Improvement Project. The applicant proposes to remove an existing rail-car bridge over Turnback Creek and install a new 12-foot wide by 70-foot long bridge, with two 6-foot by 12-foot abutments on either bank of the creek. The project will also include removal of an existing sewer line crossing Turnback Creek, and the installation of a new 10-inch high density polyethylene line, encased in cement across the creek.

Contact Information

Name
Brian Erlandsen
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Tuolumne
Cross Streets
Box Factory Road
Total Acres
15
Parcel #
06263005, 06202013, 6219077
Waterways
Turnback Creek
Other Location Info
City/Nearest Community: Tuolumne

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print