Delta Shores MDR-6 & MDR-7 Project (Z22-010)

14 Documents in Project

Summary

SCH Number
2007042070
Lead Agency
City of Sacramento
Document Title
Delta Shores MDR-6 & MDR-7 Project (Z22-010)
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2023
Document Description
This project consists of a request for a Tentative Subdivision Map to subdivide two parcels into 197-parcels (MDR-6 101-lots; MDR-7 96-lots) on 20.5 acres, Site Plan and Design Review of the maps and 197 single-unit dwellings. Per the Delta Shores PUD Guidelines policy for additional housing designs, the applicant is requesting deviations to minimum lot size, minimum lot depth, maximum lot coverage, minimum front, rear, interior, and street side-yard setbacks, in the Single-unit Dwelling or Duplex Dwelling zone (R-1 A-PUD) and Delta Shores Planned Unit Development, and Tentative Subdivision Map Design Deviations.

Contact Information

Name
Joseph Zawidski
Agency Name
Signature Homes Inc.
Job Title
Project Manager
Contact Types
Project Applicant

Name
Ron Bess
Agency Name
City of Sacramento
Job Title
Associate Planner
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Citywide
Cross Streets
Delta Shore South Circle and Cosumnes River Boulevard
Zip
95832
Total Acres
20.5
Parcel #
053-0180-030-0000

Notice of Determination

Approving Agency
City of Sacramento
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://www.cityofsacramento.org/Community-Development/Planning/Environmental/Impact-Reports

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print