Natural Terrain Renovations, 3000 Portola Road (Pond Dredging and Site Renovations)
4 Documents in Project
Summary
SCH Number
2007042055
Lead Agency
Town of Woodside
Document Title
Natural Terrain Renovations, 3000 Portola Road (Pond Dredging and Site Renovations)
Document Type
NOD - Notice of Determination
Received
Posted
11/10/2008
Present Land Use
Residential / SCP-5 / RESA, H-14
Document Description
The project is proposed in the Recovery Action Plan for the San Francisco Garter Snake and the California Red-legged Frog at 3000 Portola Rd., Woodside, CA. The applicant proposes to restore the sag pond and wetland and upland habitats for the species listed in the Recovery Action Plan. The specific recovery actions for habitat enhancement for the species as proposed in the Recovery Action Plan: drawdown of the sag pond, dredging of sediment in the sag pond utilizing an excavator on pontoons with an inverted clam bucket, hand removal of aquatic vegetation in the sag pond, vegetation removal around the perimeter of the sag pond, and revegetation around the perimeter of the sag pond and upland areas. The property sire is located at 3000 Portola Rd.., in the Town of Woodside, San Mateo Co., approx. 2.5 mi. west of the HWY 280 interchange with Sand Hill Rd. It is approx. 41.5 acres in size.
Contact Information
Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Woodside
Counties
San Mateo
Cross Streets
Woodside Road
Total Acres
41.5
Parcel #
072-211-270
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.