Richard Moore Use Permit and Reclamation Plan (UP-06-11 / RP-06-01)

4 Documents in Project

Summary

SCH Number
2007042021
Lead Agency
Siskiyou County
Document Title
Richard Moore Use Permit and Reclamation Plan (UP-06-11 / RP-06-01)
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2007
Present Land Use
Open-pit gravel skimming quarry. Z: R-R-B-40 (Rural Residential Agricultural, 40 acre minimum parcel size), AG-1-B-80 (Prime Agricultural, 80-acre minimum parcel size), AG-2-B-80 (Non-Prime Agricultural, 80-acre minimum parcel size). GP: Prime Soils Resource Area, Wildfire Hazard Area, Erosion Hazard Area, Flood Hazard Area, and Surface Hydrology Area.
Document Description
The applicant is requesting an amendment to an existing Use Permit and Reclamation Plan to expand the existing open-pit, gravel skimming quarry from 55.5 acres to a total of 133 acres. An additional 2,100,000 cubic yards of dredger tailing piles are planned to be harvested seasonally over a 30-year mine life with annual production estimated at 30,000-200,000 cubic yards. Quarry activities would be divided into 5 phases with each phase being completed prior to the start of the next phase. Rock screening, crushing, stockpiling, and material export are planned to be located within the existing material processing area. Reclamation would include the creation of ponds and wetlands, re-vegetation, and the construction of river levees in preparation of the site as open space.

Contact Information

Name
Rowland Hickel
Agency Name
Siskiyou County Planning Department
Contact Types
Lead/Public Agency

Location

Counties
Siskiyou
Cross Streets
Hwy. 3
Zip
96014
Total Acres
133
Parcel #
031-480-310, 050; 023-600-80, 380, 390, 450, 310; 023-590-340
State Highways
3
Waterways
Scott River
Township
40N,
Range
9W
Section
1, 36
Base
MDBM
Other Location Info
City/Nearest Community: Callahan
Other Information
Township: 41N

Notice of Determination

Approving Agency
Siskiyou County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.