CCCSD A-Line Relief Interceptor and Concord Sewer Interceptor Project

2 Documents in Project

Summary

SCH Number
2007042004
Lead Agency
Central Contra Costa Sanitary District
Document Title
CCCSD A-Line Relief Interceptor and Concord Sewer Interceptor Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Z: Planned District (PD), Light Industrial (LI), Special Light Industrial (SI), Parks & Rec. GP: Reg Comm. Central Area Multiuse, Industrial Bus Park
Document Description
The proposed project consists of two components. The first component is the installation of the CCCSD's A-Line Relief Interceptor and an accompanying extension of recycled water (REW) distribution system. the second component is the rehabilitation of the force main connecting the Concord Sewage Pump Station (Pump Station) and the CCCSD's A-Line Interceptor. This component entails the installation of a new gravity-flow pipeline to replace the existing force main.

Contact Information

Name
Russell Leavitt
Agency Name
Central Contra Costa Sanitary District
Contact Types
Lead/Public Agency

Location

Cities
Concord
Counties
Contra Costa
Cross Streets
Meridian Park Boulevard and Galaxy Way
Total Acres
10
State Highways
SR 242, I-680
Airports
Buchanan Field Airport
Waterways
Walnut Creek Flood Control Channel
Township
2N
Range
2W
Base
MD

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Caltrans, Division of Aeronautics, Department of Toxic Substances Control, Department of Water Resources, Resources Agency, Resources, Recycling and Recovery, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Type Recycled water), Waste Treatment:Sewer (Sewer Pipelines)
Local Actions
Capital Projects
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Sewer Capacity, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print