City of San Clemente Recycled Water Treatment and Distribution Expansion

3 Documents in Project

Summary

SCH Number
2007041098
Lead Agency
City of San Clemente
Document Title
City of San Clemente Recycled Water Treatment and Distribution Expansion
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2008
Present Land Use
Public Right-of-Way
Document Description
Phase I of the recommended project requires the expansion of water reclamation capacity from 2.2 MGD to 4.4 MGD. It also requires the conversion of an existing domestic water reservoir (Reservoir 11, or Cordillera Reservoir) to recycled water use, construction of a smaller replacement domestic water reservoir adjacent to existing Reservoir 11, expansion of the Recycled Water Pump Station at the Water Reclamation Plant, construction of two pressure reducing stations, approximately 41,000 feet of pipelines ranging in size from 6-inch to 20-inch diameter, and a booster pump station for conveying recycled water to the Pacific Golf Course Pond. Facilities for connection to the Santa Margarita Water District system will be provided on Avenida Pico east of Avenida La Pata for use during outages of respective systems. Phase II of the project will be constructed if a currently proposed development at the Pacific Golf Course is approved and implemented. Phase II project will create an additional zone by constructing a new reservoir at the site of Pacific Golf Course Upper Pond, re-routing a portion of the reservoir inlet line through the proposed development, and installing an altitude valve on the existing 12-inch recycled water pipe on Avenida Pico between Calle Amanecer and Camino Vera Cruz.

Contact Information

Name
David Rebensdorf
Agency Name
City of San Clemente
Contact Types
Lead/Public Agency

Location

Cities
San Clemente
Counties
Orange
State Highways
5

Notice of Determination

Approving Agency
City of San Clemente
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print