Alta South Wind Energy Project - Alta Wind X, LLC; Alta Wind XI, LLC; Alta Wind XIII, LLC; and Alta Wind XIV, LLC (Streambed Alteration Agreement No. 1600-2012-

14 Documents in Project

Summary

SCH Number
2007041068
Lead Agency
Kern County
Document Title
Alta South Wind Energy Project - Alta Wind X, LLC; Alta Wind XI, LLC; Alta Wind XIII, LLC; and Alta Wind XIV, LLC (Streambed Alteration Agreement No. 1600-2012-
Document Type
NOD - Notice of Determination
Received
Posted
5/31/2013
Present Land Use
Undeveloped Land Exclusive Agriculture Resource-Intensive Agriculture
Document Description
The CA DFW is executing a Lake or Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code. The project includes the installation of 37 wind turbine generators and supporting infrastructure to operate them as a wind power generation facility. Major components of the project includes up to two (2) permanent and one (1) temporary meteorological tower, on-site and off-site access roads, fencing, clearing and grading, underground communication cables, underground and overhead collection systems, overhead transmission lines, two (2) collector substations, a 7.6-mile, 230 kilovolt (kV) generation tie line, laydown area, and O&M activities. Grading for the Project will excavate, contour and place fill in a portion of Oak Creek and several unnamed ephemeral tributaries. Project components that will occur in CDFW jurisdictional areas include road construction, widening of existing stream crossings, culvert and rip-rap installation, and the trenching of underground electrical collection lines.

Contact Information

Name
Lori Bono
Agency Name
Department of Fish and Wildlife (CDFW)
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
Reina Road & Renfro Road
Zip
93314
Total Acres
80
Parcel #
463-050-28 & 30
State Highways
58
Railways
AT&SF RR
Schools
Patriot ES
Township
29S
Range
26E
Section
15
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.