EDA Grant 07-49-05623

2 Documents in Project

Summary

SCH Number
2007041026
Lead Agency
City of Inland Valley
Document Title
EDA Grant 07-49-05623
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2007
Present Land Use
Specific Plan
Document Description
One of the key projects envisioned in the San Bernardino International Trade Center (SBITC) is the development of the Alliance California Airport Business Park (ACABP). The location selected for the ACABP is 180-acre site which contains 31 existing structures that were constructed and used by the Air Force. These structures total about 1.7 million square feet of area and are in poor condition and do not meet current City Building standards. The site also contains about 70-acres of paved area (roads, parking, etc.). The buildings are also known to contain hazardous materials such as asbestos and lead based paint. Other hazardous materials which may occur on the site are PCB's and petroleum products. To allow for future development of the site, IVDA is proposing to demolish, remove, and dispose of the existing structures, paving and utilities. The purpose of the project is to leave a "clean" site that can be graded and developed in the manner envisioned in the SBITC.

Contact Information

Name
Alex Estrada
Agency Name
Inland Valley Development Agency
Contact Types
Lead/Public Agency

Location

Cities
San Bernardino
Counties
San Bernardino
Cross Streets
Tippecanoe and Harry Sheppard Boulevard
Total Acres
180
State Highways
10 and 30
Railways
UPRR
Airports
San Bernardino Int'l Airport
Waterways
Santa Ana River
Township
1S
Range
3W
Section
8, 9,
Base
SBM &RSB
Other Information
Section: 16

Notice of Determination

Approving Agency
Inland Valley Development Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print