Concurrence in the Issuance of a Revised Solid Waste Facilities Permit (SWFP 13-AA-0009) for Niland Solid Waste Site in Imperial County

2 Documents in Project

Summary

SCH Number
2007041023
Lead Agency
Imperial County
Document Title
Concurrence in the Issuance of a Revised Solid Waste Facilities Permit (SWFP 13-AA-0009) for Niland Solid Waste Site in Imperial County
Document Type
NOD - Notice of Determination
Received
Posted
2/20/2008
Present Land Use
Government/Special (G/S) use purposes. GS
Document Description
This revised SWFP is to increase peak permitted traffic from 45 vehicle trips per day to 150 vehicle trips per day, increase maximum or peak elevation from 66 feet above mean sea level to 84 feet above mean sea level, and allow up to 10 county sponsored community clean up events per year and permit up to 100 tons of waste at each event. The county sponsored clean-up days may fall on a day other than the regular operating day of the solid waste site. The landfill will have an estimated closure date of September 2046.

Contact Information

Name
Raymond M. Seamans
Agency Name
California Integrated Waste Management Board
Contact Types
Lead/Public Agency

Location

Counties
Imperial
Cross Streets
Cuff Road
Parcel #
003-240-02-01
Township
10S
Range
14E
Section
26
Base
SBBM
Other Location Info
City/Nearest Community: Niland

Notice of Determination

Approving Agency
California Integrated Waste Management Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print