GPA 2007-26 (AKA Andalucia Development Project at MVCC)

2 Documents in Project

Summary

SCH Number
2007041014
Lead Agency
Mission Viejo, City of (City of Mission Viejo)
Document Title
GPA 2007-26 (AKA Andalucia Development Project at MVCC)
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2009

Document Description
The Andalucia Development project proposes to alter the streambed and banks through maintenance and removal of debris, and exotic and non-native species. The project consists of 2 phases: Phase I (exploration phase) and Phase II (future bank stabilization phase). The Department will be notified for work associated with Phase II in the fall after the Phase I, exploratory work has been conducted and the details regarding bank stabilization are identified by a seperate notification. This SAA is for Phase I activities only. The only existing debris that is layered on top of the existing riprap on the west bank will be removed using a backhoe and by hand crews. The majority of the material layered on top of the riprap appears to be debris, and includes concrete slabs, pipes, wooden palettes, green-waste, and accumulated sediment, all of which will be removed. Non-native vegetation on both banks of the subject reach of the Creek totaling ~0.17 acres will be removed by hand crews,

Contact Information
Ms. Elaine Lister
Dept. of Fish and Game
Reg 5-South Coast Region 4949 Viewridge Avenue
San Diego, CA 92123

Phone : (949) 470-3053

Location

Cities
Mission Viejo
Counties
Orange
Cross Streets
Four sites in Mission Viejo
Zip
92691
State Highways
Tollway 241 & I-5
Railways
AT& SF
Waterways
Oso Creek, Trabuco Creek

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
DFG 4949 Viewridge Avenue San Diego, CA 92123

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No