Streambed Alteration Agreement 1600-2006-0428-3 / 1-06-009 SON

Summary

SCH Number
2007039013
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement 1600-2006-0428-3 / 1-06-009 SON
Document Type
NOD - Notice of Determination
Received
Posted
3/15/2007
Document Description
The Operator proposes the construction and installation of three temporary bridge watercourse crossings in Class I (i.e., fish-bearing) watercourses. The bridge crossings are proposed on the Gualala Redwoods Inc. ownership in tributaries to the mainstem Gualala River and the South Fork Gualala River, Sonoma County. The bridges are proposed to allow timber harvesting and river gravel mining equipment to access work sites throughout the ownership. The North Fork Confluence Summer Bridge is planned as a temporary bridge crossing of the North Fork Gualala River located approximately 100 feet upstream from its confluence with the mainstem Gualala River. The Rockpile Creek Summer Bridge is planned as a temporary bridge crossing of Rockpile Creek, located approximately 500 feet upstream from its confluence with the South Fork Gualala River. The Buckeye Creek Summer Bridge is proposed as a temporary bridge crossing of Buckeye Creek, located approximately 600 feet upstream from its confluence with the South Fork Gualala River. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2006-0428-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Henry Alden of Gualala Redwoods, Inc.

Contact Information

Name
Charles Armor
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency

Location

Counties
Sonoma

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print