Nevada City Forest Fire Station Replacement Project

2 Documents in Project

Summary

SCH Number
2007032161
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Nevada City Forest Fire Station Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2007
Present Land Use
OP-SP, Office and Professional - Site Performance Combining District
Document Description
CDF is proposing to replace the existing Nevada City forest fire station and update the facilities on the project site. The project would include demolition of six existing fire station buildings and construction and operation of a new two-engine forest fire station, including: three bay apparatus building, 14 bed barracks/ mess hall, a five bay auto shop, a two bay dozer shed, administrative office building, a generator building, a flammable materials storage building, and a covered vehicle wash rack, as well as associated grading, relocation and installation of underground utilities, site drainage, retaining walls, paving, curbs, sidewalks, hose wash rack, landscaping, and fencing. The 4,587 square foot Garage/ Telecom building will not be demolished.

Contact Information

Name
Brian Wilkinson
Agency Name
Department of General Services
Contact Types
Lead/Public Agency

Location

Cities
Nevada City
Counties
Nevada
Cross Streets
SR 20 and Ridge Road
Zip
95959
Total Acres
8.1
Parcel #
35-210-14
State Highways
20
Schools
Sierra Christian School
Waterways
Deer Creek
Township
16N
Range
8E
Base
MD

Notice of Determination

Approving Agency
California Dept. of Forestry and Fire Protection
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print