McElroy Properties, Linda Avenue Development, Culvert Outfall and Riparian Corridor Enhancement

5 Documents in Project

Summary

SCH Number
2007032104
Lead Agency
City of Los Gatos
Document Title
McElroy Properties, Linda Avenue Development, Culvert Outfall and Riparian Corridor Enhancement
Document Type
NOD - Notice of Determination
Received
Posted
9/9/2008
Present Land Use
Single Family Residential / R-1:8 / Low Density Residential
Document Description
The project is located on the south bank of Ross Creek at 15881 Linda Avenue in the City of Los Gatos. The jurisdictional portion of the project involves the construction of an outfall structure into Ross Creek and enhancement of the riparian corridor. A bio-swale along the outside edge of the riparian corridor, approximately 5 feet wide and 125 feet long, will filter and drain flows eastward. Excess storm drainage would then enter a 12-inch corrugated metal pipe storm drain in the northeast corner of the site and discharge into Ross Creek. The bio-swale and outfall structure into Ross Creek is needed for the development of the site, which will create seven residential lots, a common area, and appropriate access facilities.

Contact Information

Name
Dave Johnston
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Los Gatos
Counties
Santa Clara
Cross Streets
Blossom Hill Road
Zip
95032
Total Acres
2.32
Parcel #
523-25-020 and 036
State Highways
85 and 17
Schools
Blossom Hill ES, Leigh HS
Waterways
Ross Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print