Vargas

4 Documents in Project

Summary

SCH Number
2007032020
Lead Agency
City of Dublin
Document Title
Vargas
Document Type
NOD - Notice of Determination
Received
Posted
5/4/2007
Present Land Use
The project area currently has a residential dwelling unit, accessory structures, and a horse barn. The General Plan land use is Medium and Medium/High Density Residential.
Document Description
The proposed project includes annexation of the 4.38 acre site to the City of Dublin and the San Ramon Services District. The development project includes a maximum of 33 dwelling units and a small pedestrian trail near the creek. The project includes a request to change the General Plan and Specific Plan Land Use Designations on the site. The project site currently has two land use designations: Medium-Density Residential (approx. 1.4 gross acres) which permits a density of 6.1 to 14.0 dwelling units per acre, and Medium/High-Density Residential (approx. 3.6 gross acres) which permits a density of 14.1-25.0 dwelling units per acre. The Applicant has proposed a General Plan and Specific Plan Amendment to change the existing land uses to Medium Density to allow the construction of 33 dwelling units on the site (a reduction in the existing density).

Contact Information

Name
Erica Fraser
Agency Name
City of Dublin
Contact Types
Lead/Public Agency

Location

Cities
Dublin
Counties
Alameda
Cross Streets
Tassajara Road near Fallon Road (future)
Zip
94568
Parcel #
986-0004-002-01
State Highways
I-580
Schools
Quarry Lane Private School
Waterways
Tassajara Creek

Notice of Determination

Approving Agency
Dublin City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print