Tippecanoe Avenue Street Improvement Project

2 Documents in Project

Summary

SCH Number
2007031150
Lead Agency
City of Inland Valley
Document Title
Tippecanoe Avenue Street Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2007
Present Land Use
Arterial Roadway on the City General Plan Circulation Element.
Document Description
The Tippecanoe Avenue street improvement alignment encompasses the approximately 3,200 feet of Tippecanoe Avenue from the southern corner of Mill Street to a point just north of the Santa Ana River. Tippecanoe Avenue is identified as having a 100-foot right-of-way (right-of-way will be 120-feet in width following construction) and the segment that will be constructed under this action is approximately 3,200 feet in length. The project also includes installation of associated curb and gutter, medians, sidewalk, and storm drain and a new outlet into the Santa Ana River. The proposed storm drain facility will be installed on the east side of the Tippecanoe Avenue alignment and it will outlet into the River, just east of the Tippecanoe bridge that presently crosses the Santa Ana River. No alterations are proposed for the bridge. A median will be constructed as part of the proposed project. The proposed curb system will range from six to eight inches.

Contact Information

Name
Alex Estrada
Agency Name
Inland Valley Development Agency
Contact Types
Lead/Public Agency

Location

Cities
San Bernardino
Counties
San Bernardino
Cross Streets
Mill Street and Central Avenue
Total Acres
~ 10
State Highways
I-10 Freeway
Railways
BNSF Railway Company
Airports
San Bernardino
Waterways
Santa Ana River
Township
1S
Range
5W
Base
SBM

Notice of Determination

Approving Agency
Inland Valley Development Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print