Athens Sun Valley Material Recovery Facility

5 Documents in Project

Summary

SCH Number
2007031090
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
Athens Sun Valley Material Recovery Facility
Document Type
NOD - Notice of Determination
Received

Document Description
The Athens Sun Valley Materials Recovery Facility (ASVMRF) would process a total of 1,500 tons of solid waste and recyclables per day. Of the total, 1,000 tons per day (tpd) would be municipal solid waste (MSW) and 500 tpd would be construction, demilition and Inert material (C&D). MSW and C&D would be processed in separate enclosed buildings. The facility currently processes ~400 tpd of C&D materials and operates under Conditional Use Permit (ZA 98-0427) issued in January 1999, which permits the establishment, use and maintenance of Recycling Materials Process and Sorting Facility (Recycling Center) for mixed waste, construction and demolition waste for purposes of deposting, sorting, processing and transferring a maximum of 1,500 tpd of solid waste, in the M2-1G Zone. The facility also operates in accordance with a Temporary Solid Waste Facility Permit.

Contact Information
Wayne Tsuda
City of Los Angeles. EnvironmentLA
3550 Wilshire Boulevard, 18th Floor Mail Stop 115
Los Angeles, CA 90010

213-252-3939

Location

Coordinates
34°14'18"N 118°22'"W
Cities
Los Angeles, City of Los Angeles
Counties
Los Angeles
Cross Streets
Pendleton Street and Glenoaks Boulevard
Zip
91353
Total Acres
4.99
Parcel #
253-011-010
State Highways
Interstate 5
Railways
United Pacific
Airports
Whitman/Hollywood/Burbank
Schools
Stonehurst Elementary
Waterways
None

Notice of Determination

Approving Agency
City of Los Angeles, EnvironmentLA
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
www.ci.la.ca.us/ead/enforcement/enf_leapermits.htm

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search