Verdemont Water Infrastructure Project

3 Documents in Project

Summary

SCH Number
2007031079
Lead Agency
San Bernardino Valley Municipal Water District
Document Title
Verdemont Water Infrastructure Project
Document Type
NOD - Notice of Determination
Received
Posted
5/7/2007
Present Land Use
Residential
Document Description
The City of San Bernardino Municipal Water Department (CSBMWD) proposes to improve Verdemont area water infrastructure to meet the demands of existing, improved and entitled development. New development has been approved and is being constructed in the Verdemont Area pressure zones (2100 and 2300) that will require additional water availability. The Department is mandated to provide water to entitled developments. The proposed project will connect existing water supplies to new pump stations and a reservoir (up to 5 million gallons storage) designed to provide the higher pressure zones with sufficient capacity to meet projected need. Under existing conditions, the 2300 Pressure Zone depends upon a hydro pneumatic pumping station that is subject to maintenance problems and expensive to operate. The Verdemont Improvements would provide gravity fed water supply to the 2300 Pressure Zone that is more reliable and less expensive than the existing system and would also increase the reliability of water service by providing redundancy within the existing system such that water service does not rely on a single pipeline, pump or reservoir.

Contact Information

Name
Mr. Matthew Litchfield
Agency Name
San Bernardino Valley Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
San Bernardino
Counties
San Bernardino
Cross Streets
Palm Avenue and Kendall Drive
State Highways
1-215 Freeway
Waterways
Unnamed creek channel
Township
2N
Range
5W
Section
36
Base
SBM

Notice of Determination

Approving Agency
City of San Bernardino Municipal Water Department
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print