SPUD Wastewater Treatment Plant Improvement (Extension of Streambed Alteration Agreement No. 1600-2009-0319-R4)
6 Documents in Project
Summary
SCH Number
2007031077
Lead Agency
Springville Public Utility District
Document Title
SPUD Wastewater Treatment Plant Improvement (Extension of Streambed Alteration Agreement No. 1600-2009-0319-R4)
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2015
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement number 1600-2015-0001-R4, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Springville Public Utility District.
The Project is part of activities related to the installation of treatment process improvements at an existing water treatment plant. The construction of a 50-foot portion of the pipeline is expected to impact the bed, bank, channel, and riparian zone of the Tule River. The utility district will utilize a subterranean collector pipe installed underneath the riverbed to collect and divert water, in lieu of an above-ground structure that would utilize screens. A trench 4 foot deep by 3 feet wide will be dug to accommodate the installation of the pipeline. Excavated materials (approximately 8 cubic yards) plus additional construction materials will be used to recontour the bank.
Contact Information
Name
Carrie Swanberg
Agency Name
CDFW Central Region
Contact Types
Lead/Public Agency
Phone
Location
Counties
Tulare
Cross Streets
Highway 190
Zip
93265
Total Acres
< 5
Parcel #
284-150-007
State Highways
190
Waterways
Tule River, North Fork, Middle Fork
Township
21S
Range
29E
Section
1
Base
MDB&M
Other Location Info
City/Nearest Community: Springville
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes