San Jose Creek Capacity Improvement Project

3 Documents in Project

Summary

SCH Number
2007031035
Lead Agency
City of Goleta
Document Title
San Jose Creek Capacity Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2009
Document Description
The Applicant intends to alter the streambed modify the existing conrete lined channel to provide flood protection and fish passage. Components of the project include the removal and replacement of 80 linear feet of the existing trapezoid concrete lining with new poured in place vertical walls above Hollister Avenue. In the 70 ft downstream of Hollister Bridge, and under the bridgem the existing conrete will be removed and replaced with transition from vertical walls under the bridge to the existing trapezoid section on the west bank and a new section on the east bank. The areas of transition and the area along the bottom of the channel will consist of various sized rock revetment with joint willow plantings. No changes will be made to the west bank for 3,000 linear feet. the concrete on the east bank will be removed and replaced with a new concrete channel that will be widened 7 to 12 feet to include the fish passage component. The east bank will include a 4 to 4 ft high vertical flood wall on the top of the bank. An existing steel vehicle bridge 100 feet downstream of Hollister Avenue will be removed, along with a sewer line. The new sewer line will be relocated under State Route 217 using a jack and bore method. From 3,000 ft downstream to 4,000 feed from Hollister Avenue, both banks will be altered to widen the channel to ~75 ft, and due to a sewer line, the low flow channel will transition from 2 to 3 ft deep, to construction of 8 to 12 inch high concrete berms along the bottom. A new 42 inch high flood wall will be constructed along the west bank from 2,000 ft downstream of Hollister Avenue, to South Street. Excavation for the wall footings will be 3 to 5 ft deep. The fish passage component consists of the low flow channel, about 10 to 12 ft wide, 2 to 3 ft deep, with notches and/or slotted weirs, for the entire length of the project area.

Contact Information

Name
Natasha Lohmus
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Hollister Avenue / Kellogg Avenue
Total Acres
15
State Highways
US 101 and SR 217
Railways
UPRR
Airports
Santa Barbara Municipal Airport
Schools
Kellogg ES, Hollister ES, El Camino ES, Foothill ES, La Patera E
Waterways
San Jose Creek, San Pedro Creek, Atascadero Creek, Maria Ygnacio Creek, Los Carneros Creek, Teco
Section
Varies
Other Information
Schools: La Patera ES, Mountain View ES, Goleta Valley JH, San Marcos HS, UC Santa Barbara. Waterways: Tecolotito Creek, Goleta Slough, Pacific Ocean.

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print