Smart Energy Transport System, Phase I

5 Documents in Project

Summary

SCH Number
2007031007
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
Smart Energy Transport System, Phase I
Document Type
EIR - Draft EIR
Received
Present Land Use
Pipeline site: public streets/highway alignments, railroad crossings, linkages across the Dominguez Channel, Port of Los Angeles, and LAX property, various general plans and zoning; Ancillary facility sites; industrial zoned property.

Document Description
The Smart Energy Transport System (the "Project") is a fuel delivery system that would include an approximate 24-mile pipeline of 12 to 16 inches in diameter as well as ancillary pumping and receiving systems. The proposed pipeline would originate at the Vopak Inland Terminal in the Wilmington area of the City of Los Angeles, travel north through the City of Carson, unincorported Los Angeles County, City of Compton, additional areas within City of Los Angeles, City of Gardena and City of Hawthorne, arriving at the Los Angeles International Airport (LAX). The proposed ancillary facilities would include a new pump station at the Vopak Inland Terminal, a new delivery connection to the Watson Pump Station in Carson, and a new receiving system at LAX. The Project is proposed to proceed in two phases. Phase 1 consists of the portion of the alignment between the Vopak Terminal and the Watson Pump Station, and ancillary equipment at Vopak and Watson. Construction of Phase 1 of the Project is anticipated to begin in September 2008 and end in February 2009. Phase 2 consists of the portion of the alignment between the Watson Pump Station and LAX. Construction of Phase 2 is expected to begin as early as April 2012.

Contact Information
Michael Silverman
Los Angeles City Department of Public Works
1149 S. Broadway, Suite 600
Los Angeles, CA 90015

Phone : (213) 485-5745

Location

Cities
Carson Compton Gardena Hawthorne Los Angeles Los Angeles, City of, Carson, Compton, Gardena, Hawthorne
Counties
Los Angeles
Cross Streets
Start: approximately Lomita Boulevard/Alameda Street; Terminus: LAX
Zip
various
Total Acres
~ 24 miles
Parcel #
various
State Highways
I-105,I-405,I-110,I-710,SR-91
Railways
UPRR and BNSF
Airports
LAX,Compton,Hawthorne
Schools
2 adjacent & 9 others within 0.25 mile
Waterways
Dominguez Channel, Pacific Ocean (Los Angeles Harbor)
Township
variou
Range
variou
Section
variou
Base
SBB&M

Notice of Completion

Review Period Start
Review Period End
Development Type
Other (Fuel Delivery System (pipeline, ancillary facilities))
Local Action
Other Action Other Action: Easements, crossing permits, and franchise agreements
Project Issues
Air Quality Archaeologic-Historic Drainage/Absorption Flood Plain/Flooding Forest Land/Fire Hazard Geologic/Seismic Noise Public Services Schools/Universities Soil Erosion/Compaction/Grading Toxic/Hazardous Traffic/Circulation Vegetation Water Quality Water Supply Wetland/Riparian Wildlife Growth Inducing Land Use Cumulative Effects
Reviewing Agencies
Air Resources Board, Airport/Energy Projects California Coastal Commission California Department of Conservation California Department of Fish and Wildlife, South Coast Region 5 California Department of Parks and Recreation California Department of Transportation, District 7 California Highway Patrol California Public Utilities Commission California Regional Water Quality Control Board, Los Angeles Region 4 Department of Toxic Substances Control Resources Agency Resources, Recycling and Recovery California Native American Heritage Commission Caltrans, Division of Aeronautics

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print