Coliseum BART to Bay Trail Connector

2 Documents in Project

Summary

SCH Number
2007022116
Lead Agency
Alameda County
Document Title
Coliseum BART to Bay Trail Connector
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2007
Present Land Use
Oakport Street to I-880: No GP designation I-880 to the railroad tracks: Regional Commercial RR tracks to San Leandro Street: Regional Commercial
Document Description
The project would consist of constructing an approximately one mile long trail connecting the Coliseum BART Station to the Bay Trail. The trail would start at the Coliseum BART station utilizing the existing BART/Coliseum walkway, would pass over the Amtrak Coliseum Station, and would cross above the railroad tracks (grade-separated). A pedestrian ramp would be constructed to link the elevated walkway to the maintenance road adjacent to Daemon Slough. The trail would then follow the Damon Slough on the maintenance road and would involve upgrading the gravel roadway surface to asphalt including installation of signs and pavement markings, and fencing. The trail would cross I-880 using the existing 66th Avenue freeway over-crossing, involving minor modifications to the existing sidewalk (increasing the width to 12 feet), narrowing the lane widths, and installation of a barrier between the sidewalk and the traffic lanes. This proposed facility would then link with the Bay Trail at the western end of 66th Avenue.

Contact Information

Name
Jim Browne
Agency Name
Alameda County Public Works Agency
Contact Types
Lead/Public Agency

Location

Cities
Oakland
Counties
Alameda
Cross Streets
66th Avenue, 73rd Avenue, San Leandro Street, Coliseum Way
State Highways
I-880, SR 185
Railways
Amtrak, BART
Airports
Oakland International
Waterways
Daemon Slough, S.F. Bay (San Leandro Bay)
Township
2S
Range
3W
Section
16L
Base
MD

Notice of Determination

Approving Agency
Alameda County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print