Sierra Pacific Power Company Hirschdale Power Line Project

3 Documents in Project

Summary

SCH Number
2007022078
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Sierra Pacific Power Company Hirschdale Power Line Project
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2007
Present Land Use
The project is located entirely within the jurisdiction of Nevada County and the parcels through which it would traverse are designated by the Nevada County General Plan for Neighborhood Commercial (NC); Urban High Density Residential (UHD); Estate (EST) and Planned Development (PD) uses (Nevada County, 2004). Existing land use: open space, ranch lands, farmlands, and housing.
Document Description
Sierra Pacific will construct ~3,500-foot power line of new 60 kilovolt (kV) circuit on an existing 12.5 kV distribution line in unincorporated Nevada County, pursuant to CPUC General Order 131-D. The project iwll include the removal and installation of 19 poles, string of new conductor and relocation of existing distribution to the new poles. The entire proposed route would be located on an existing Sierra Pacific easement.

Contact Information

Name
Junaid Rahman
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Cities
Truckee
Counties
Nevada
Cross Streets
Hirschdale Road, Juniper Way, Floriston Road
Zip
96161
Parcel #
Multiple
State Highways
I-80
Railways
UPRR
Waterways
Truckee River
Township
18N
Range
17E

Notice of Determination

Approving Agency
California Public Utilities Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print