Caples Lake Boat Launch Facility and Access Road

7 Documents in Project

Summary

SCH Number
2007022077
Lead Agency
El Dorado Irrigation District
Document Title
Caples Lake Boat Launch Facility and Access Road
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2008
Present Land Use
Recreation
Document Description
SAA# 1600-2008-0070-R2 Construction of boat launching facilities including a 175 foot long by 40 foot wide concrete boat launch ramp designed to extend below the lake surface elevation, a parking lot approximately 370 feet long by 190 feet wide, an associated 8 foot wide boarding float, a gangplank to access the boarding float, a 175 foot asphalt approach ramp, day use picnic facilities, public restroom facilities, an access road from State Highway 88 with an associated culvert crossing of an ephemeral stream, and an oil/water separator to collect and treat storm water runoff from the parking lot to prevent most hydrocarbon based contaminants from entering the lake.

Contact Information

Name
Robert C. Hosea
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Alpine
Cross Streets
SR 88
Total Acres
4 +/-
State Highways
88
Waterways
Caples Lake
Township
10N
Range
18E
Section
18
Base
MDBM
Other Location Info
City/Nearest Community: Kirkwood

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print