Valley Slurry Seal Shell Building Conditional Use Permit, CUP 06-08
2 Documents in Project
Summary
SCH Number
2007022072
Lead Agency
City of West Sacramento
Document Title
Valley Slurry Seal Shell Building Conditional Use Permit, CUP 06-08
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2007
Present Land Use
Heavy construction vehicle staging and maintenance yard; paving emulsion manufacturing and storage plant.
Z: Waterfront Industrial (M-3)
GP: Water-Related Industrial (WRI)
Document Description
The project would construct a concrete tilt-up building to house administrative offices and vehicle maintenance bays for the applicant, Valley Slurry Seal. The proposed project would allow Valley Slurry Seal to both relocate their administrative offices from 3050 Beacon Boulevard to the project site and bring their vehicle maintenance operations inside an enclosed building. The proposed building would consist of approximately 6,910 square feet of office, approximately 8,340 square feet of vehicle maintenance area, approximately 5,510 square feet of storage area. No public funding is proposed or anticipated.
Contact Information
Name
John Powderly
Agency Name
City of West Sacramento
Contact Types
Lead/Public Agency
Phone
Location
Cities
West Sacramento
Counties
Yolo
Cross Streets
Channel Drive and Enterprise Boulevard
Zip
95691
Total Acres
5.6
Parcel #
67-053-14
State Highways
US 50, Bus 80, I-80
Railways
Sierra RR - former Clarksburg br
Airports
California Highway Patrol Academ
Schools
River City HS, Bridgeway Island ES, Southport ES
Waterways
Port of Sacramento Deep Water Ship Channel
Township
8N
Range
4E
Section
6
Base
MDBM
Other Information
Railways: Former Clarksburg branch of the Sierra RR.
Notice of Determination
Approving Agency
City of West Sacramento
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.