Kirkwood Snowmaking System

4 Documents in Project

Summary

SCH Number
2007022059
Lead Agency
Alpine County
Document Title
Kirkwood Snowmaking System
Document Type
NOD - Notice of Determination
Received
Posted
4/26/2007
Present Land Use
Current land uses within the Kirkwood area include a winter snow sports resort, residential, commercial, open space, recreation, public services, and roads. Private lands at Kirkwood fall within the jurisdiction of Alpine, Amador, and El Dorado counties. The 2003 Kirkwood Specific Plan has been adopted by Alpine and Amador counties. The General Plan designations for Kirkwood in each of the three counties are: Alpine County: Planned Development; Amador County: Special Planning; El Dorado County: Adopted Plan.
Document Description
The proposed project involves the updating and replacing various permit conditions from the conditional use permit issued by Alpine County in 1996 in order to make the snowmaking operation consistent with the 2003 Kirkwood Specific Plan; authorizing the use of electric air compressors in place of diesel compressors currently in use; and, an extension of time to make beneficial use of water for snowmaking pursuant to existing water rights permits.

Contact Information

Name
Brian Peters
Agency Name
Alpine County Planning Department
Contact Types
Lead/Public Agency

Location

Counties
Alpine
Cross Streets
Kirkwood Meadows Drive
Parcel #
005-520-002
State Highways
SR 88
Township
9, 10N
Range
17,18E
Base
MDBM
Other Location Info
Nearest Community: Kirkwood

Notice of Determination

Approving Agency
Alpine County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print