Dam Maintenance Program (DMP)
16 Documents in Project
Summary
SCH Number
2007022052
Lead Agency
Santa Clara Valley Water District
Document Title
Dam Maintenance Program (DMP)
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Parks, open space, low-density residential
Document Description
In an effort to streamline the maintenance process for regular maintenance activities at 14 water supply dams, the Water District has assembled a detailed Dam Maintenance Program (DMP) and EIR which will cover anticipated activities for a ten-year period. The DMP includes a wide range of anticipated regular maintenance activities such as: vegetation management; rodent control; exploratory trenching; inspections; sediment removal; access road and boat ramp repair work; erosion control; repair and maintenance of seepage systems, pipes, valve systems, hydraulic systems, outlets, inlet structures; and trash /debris removal.
Contact Information
Name
Terry Neudorf
Agency Name
Santa Clara Valley Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Cupertino, Los Gatos, Morgan Hill, San Jose
Counties
Santa Clara
Cross Streets
14 dams, County-wide
Parcel #
various
State Highways
17, 101, 85
Waterways
Guadelupe, Coyote, Stevens, Uvas, Llagas Watersheds
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of State Parks, Division of Boating and Waterways, California Department of Transportation, District 4 (DOT), California Energy Commission, California Native American Heritage Commission (NAHC), California State Lands Commission (SLC), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Loans and Grants, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
Local Actions
Maintenance of existing dams
Project Issues
Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Transportation, Vegetation, Wetland/Riparian, Wildlife, Dam Safety
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.