Power Line-Elkhorn Substation Capacity Expansion Project
4 Documents in Project
Summary
SCH Number
2007022043
Lead Agency
Sacramento Municipal Utility District
Document Title
Power Line-Elkhorn Substation Capacity Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2008
Present Land Use
The substation capacity expansion site would be located on land designated Public Facilities and zoned AG-80.
Document Description
SMUD proposes to replace a 3.75 megavolt-amperes (MVA) transformer with a 25 MVA transformer, and a 12.5 MVA transfer with a 25 MVA transformer, increasing the capacity of the substation from 16.25 to 50 MVA. Additional improvements include a 69,000-volt (69-kV) bus structure and three 69-kV circuit breakers, new switchgear, new cement slabs for the equipment and grounding, and fencing to encompass the new footprint of the substation. The existing 69-kV pole line would remain. Reconductoring would be required to increase ampacity for the capacity increase. Additionally, five new 12,000 volt (12-kV) feeders would be added (totaling eight 12-kV feeders), and the existing 69-kV pole arrangement to the transformers would be replaced. The existing substation site is connected to the Elverta Circuit #1 and the Natomas Circuit #2 existing overhead (69-kV) lines within SMUD's subtransmission grid system.
Contact Information
Name
Ron Scott
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency
Phone
Email
Location
Counties
Sacramento
Cross Streets
Power Line Road and Elkhorn Boulevard
Zip
95835
Total Acres
1.12
Parcel #
201-0230-036-0000, 045-0000
State Highways
SR 70/00, I-5
Airports
Sacramento International Airport
Waterways
Unnamed drainage 370 feet west of the site; RD 1000 drainage canal along Power Line Road
Township
10N
Range
4E
Section
30
Base
MDB&M
Other Location Info
City/Nearest Community: North Natomas
Notice of Determination
Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.