Addendum No. 2 Reservoir Management System and Chlorine Analyzers and Reservoir Mixers/Samplers at Domestic Water Reservoirs Final IS/MND

5 Documents in Project

Summary

SCH Number
2007021140
Lead Agency
Irvine Ranch Water District
Document Title
Addendum No. 2 Reservoir Management System and Chlorine Analyzers and Reservoir Mixers/Samplers at Domestic Water Reservoirs Final IS/MND
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2021
Document Description
An NOD was filed on May 1, 2007 for the original 2007 MND, and on May 12, 2015, the NOD was re-filed for Addendum No. 1. The proposed modifications to the original project are summarized below: -A new, approximately 279-square-foot RMS building with chemical storage, metering pumps, chlorine residual analyzer, and mixers -A new concrete stairway and walkway connecting the pump station building to the top of the reservoir -A widened access road with security gate ·A new security fence and elongated existing retaining wall -Relocation of existing electrical conduit and gas lines reading lo Ihe pump station -A new sewer connection

Contact Information

Name
Jo Ann Corey
Agency Name
Irvine Ranch Water District
Job Title
Environmental Compliance Analyst
Contact Types
Lead/Public Agency

Location

Regions
Citywide
Cross Streets
13 1/2 Minaret Drive, Irvine, Orange County, California

Notice of Determination

Approving Agency
Irvine Ranch Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
https://www.irwd.com/doing-business/envlronmental-documents

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print