Addendum No. 1 to the Reservoir Management System (RMS)/Chlorine Analyzers Final IS/MND
5 Documents in Project
Summary
SCH Number
2007021140
Lead Agency
Irvine Ranch Water District
Document Title
Addendum No. 1 to the Reservoir Management System (RMS)/Chlorine Analyzers Final IS/MND
Document Type
NOD - Notice of Determination
Received
Posted
5/18/2015
Present Land Use
Residential, public, preservation, open space, agricultural
Document Description
The NOD was previously filed on May 1, 2007 (Document #200785000434).
The project proposes minor modifications to the RMS and Chlorine Analyzers and Reservoir Mixers/Samplers at Domestic Water Resources Final IS/MND related to installation of RMS at the Portola Zone 8 Reservoir and the Foothill Zone 6 Reservoir to replace the Chlorine Analyzers and Reservoir Mixer/Samplers at those reservoirs. Additional modifications included an increase in length of each chemical storage building from what was previously assessed from 24 feet to 37 feet and a decrease in the amount of chemicals to be stored at each site from 1,000 to 500 gallons of 12% sodium hypochlorite.
Contact Information
Name
Jo Ann Corey
Agency Name
Irvine Ranch Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Irvine, Orange
Counties
Orange
Regions
Unincorporated
Other Location Info
City/Nearest Communities: Foothill Ranch, Lake Forest, Newport Coast, and Silverado Canyon
Notice of Determination
Approving Agency
Irvine Ranch Water District (IRWD)
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.