Cabrillo Bridge Replacement Project
3 Documents in Project
Summary
SCH Number
2007021124
Lead Agency
City of Santa Barbara
Document Title
Cabrillo Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/3/2009
Present Land Use
Bridge and drainage.
Document Description
The Applicant intends to replace a deteriorated existing bridge, with a 131 foot long, 90 foot wide bridge, with six foot wide side walks on each side. Also, a trail bridge for pedestrians and bicycle riders will be constructed on the south side of the new bridge. It will be 20 feet wide, and carry several utility lines, including an 8 inch gas main. A temporary pedestrian and bike bridge will be constructed about 50 feet south of the existing bridge to maintain public access during construction. The 14 foot wide, 100 foot long bridge will span the lagoon and will carry the utilities until the permanent bridge is completed. The temporary bridge and abutments will be removed after completion of the project. New bank protection will be installed on the on both banks between Cabrillo and State Street to replace existing timber pile walls. Vertical pre-cast concrete walls will match the alignment of the existing walls, but will be set back near the bridge, to transition to the wider configuration. A planting zone with the average width of 15 feet will be installed on the north bank, and an average of a 2 foot wide zone on the south bank. This area will be planted with native species. Ungrouted boulders will replace the existing sackcrete bank protection and will be installed on both banks downstream of the trail bridge, 90 feet on the west side and 160 feet on the east bank. The walls include tidewater goby hideouts or 'refugia', and boulder clusters for both steelhead and tidewater gobies to hide in during strong flows. Native plants will be planted in a 10 foot wide strip above the boulders.
Contact Information
Name
Natasha Lohmus
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Cabrillo Boulevard between State Street and Helena Avenue
State Highways
101
Railways
SPRR
Schools
City College, McKinley, Franklin School, Santa Barbara Community
Waterways
Mission Creek, Laguna Channel
Township
4N
Range
27W
Base
Santa Ba
Other Information
Base: Santa Barbara.
Schools: Santa Barbara Community Academy.
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes