Regional Wastewater Facilities Replacement
2 Documents in Project
Summary
SCH Number
2007021113
Lead Agency
Rubidoux Community Service District
Document Title
Regional Wastewater Facilities Replacement
Document Type
NOD - Notice of Determination
Received
Posted
4/18/2007
Present Land Use
The project site is located near a rural residential neighborhood, adjacent to the Santa Ana River, and consists of a narrow corridor along existing roads.
Z: Watercourse, Watershed, and Conservation Areas (W-1)
GP: Open Space-Recreation (OS-R) and Low Density Residential (LDR)
Document Description
The project is anticipated to include:
- Demolition and removal of the existing temporary facilities;
- Construction of the new Regional Lift Station with a peak flow capacity of 8.0 MGD, and the new Juan Diaz Lift Station with a peak flow capacity of 0.6 MGD, to replace the existing regional lift station with a peak flow capacity of 8.6 MGD;
- Construction of new 14" and 18" force mains, with portions (approximately 2,600 linear feet) to be conventionally installed (open-trench);
- Construction of a new 12" gravity sewer, approximately 2,200 feet in length, from the intersection of Peralta Place and Riverview Drive to the proposed Regional Lift Station;
- Construction of a new 24" gravity sewer, approximately 250 feet in length of which approximately 90 linear feet will be bored and jacked underneath the Sunnyslope Channel, from the new Regional Lift Station, connecting to an existing gravity sewer easterly of the Sunnyslope Channel;
- Construction of facilities to provide wastewater service to the Riverside County Regional Park and Open-Space District's maintenance building and Louis Rubidoux Nature Center (Nature Center), which includes a new 6" gravity sewer lateral (approximately 300 feet in length) from the Nature Center building connecting to the proposed 12" gravity sewer, installing the Maintenance Building Lift Station (40 gpm capacity) within the maintenance yards, easterly of the intersection of Riverview Drive and Kern Drive, and a new 2" force main (approximately 600 feet in length) extending from the new Maintenance Building Lift Station to the proposed 12" gravity sewer in Riverview Drive;
- Construction of an access road from Riverview Drive to the Regional Lift Station;
- Construction of a 4" water pipeline (approximately 900 feet in length, within the proposed access road) from an existing 8" water pipeline in Riverview Drive to the Regional Lift Station;
- Abandonment and removal of the existing Regional Lift Station; and
- Abandonment of the existing 18" and 24" gravity sewers that were not washed out on January 9, 2005.
Contact Information
Name
David D. Lopez
Agency Name
Rubidoux Community Service District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Riverside
Cross Streets
Riverview Drive at Avenue Juan Diaz and Riverview Drive at Jodie Lane
Zip
92509
Total Acres
~ 0.75
Parcel #
186-230-007, 034, 035; 186-240-003; 186-250-010
State Highways
60
Railways
UPRR, Metrolink
Airports
Flabob Airport, Riverside Munici
Schools
West Riverside ES, Pacific Avenue ES, Peralta ES, Mountain View
Waterways
Santa Ana River, Sunnyslope Channel
Township
2S
Range
5W
Section
20, 29
Base
SBM
Other Location Info
City/Nearest Community: Rubidoux
Other Information
Schools: Mountain View ES, Indian Hills ES, Camino Real ES, Harvest Christian ES, Adams ES, Our Lady of Perpetual Help ES, Jefferson ES, Grace Christian ES, Ina Arbuckle ES, Rustic Lane ES, Mission MS, Sierra MS, Rubidoux HS.
Notice of Determination
Approving Agency
Rubidoux Community Service District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.