The Explosion Corridor Transit Project Phase 2
8 Documents in Project
Summary
SCH Number
2007021109
Lead Agency
Exposition Metro Line Construction Authority
Document Title
The Explosion Corridor Transit Project Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2010
Document Description
The Recommended Preferred Alternative (RPA) for the Expo Phase 2 project is an ~6.6 mile LRT extension of the Expo Phase 1 project. In the Final Environmental Impact Report (FEIR), it is identified as LRT Alternative 2 (Expo ROW-Colorado), as delineated in Figure 1 (Recommended Preferred Alternative, LRT Alternative 2: Expo ROW-Colorado). The Expo Phase 2 project would utilize the existing Exposition ROW from the ROW from the Expo Phase 1 terminus in Culver City to its intersection with Olympic Boulevard in Santa Monica. From that point, the LRT alignment would continue within the Exposition ROW to west of 19th Street, then diverge from the ROW and enter onto Colorado Avenue east of 17th Street and follow the center of Colorado to the proposed terminus between 4th and 5th Streets.
Contact Information
Name
Susan Bransen
Agency Name
CA Transportation Comm.
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Culver City, Culver City, Santa Monica, Los Angeles, City of, Los Angeles, Santa Monica
Counties
Los Angeles
Cross Streets
Start at Venice/Robertson in Culver City, extends ~ 6-8 mi 4th St/Colorado in S. Monica
Zip
Various
Parcel #
Various
State Highways
I-10 and I-405
Railways
No
Airports
Santa Monica Municipal
Schools
Various
Waterways
Pacific Ocean, Ballona Creek, and Sepulveda Channel
Notice of Determination
Approving Agency
CA Transportation Comm.
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.