Iris Canyon Creek Restoration Project, Agreement No. 2007-0148-R4
3 Documents in Project
Summary
SCH Number
2007021090
Lead Agency
City of Monterey
Document Title
Iris Canyon Creek Restoration Project, Agreement No. 2007-0148-R4
Document Type
NOD - Notice of Determination
Received
Posted
1/18/2008
Present Land Use
Open Space / Open Space / Open Space
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant, the City of Monterey, represented by Andreas Baer, for its Iris Canyon Creek Restoration. The applicant proposes to install a series of five grade control log-drop structures; grade the stream banks to a reduced slope; install earth-retaining systems and rock slope protection to prevent Monterey pines from being undercut by failing banks. The project will also require the removal of up to 31 Coast live oak trees with diameter at breast height (DBH) of between 3 to 14 inches. Restoration will include planting the exposed slopes with native trees and shrubs, and compensating for removed oak trees.
Contact Information
Name
Brian Erlandsen
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Monterey
Counties
Monterey
Cross Streets
Fremont Street
Zip
93940
Total Acres
< 1
State Highways
1
Waterways
Iris Canyon Creek
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.