Rapid Infiltration and Extraction (RIX) Enhancement Project

2 Documents in Project

Summary

SCH Number
2007021068
Lead Agency
City of San Bernardino
Document Title
Rapid Infiltration and Extraction (RIX) Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/28/2007
Present Land Use
Agua Mansa Industrial Corridor Specific Plan
Document Description
The City of San Bernardino Municipal Water Department is acting as CEQA lead agency for the Colton/San Bernardino Regional Tertiary Treatment and Water Reclamation Authority's expansion of its existing Rapid Infiltration and Extraction (RIX) facility. The RIX facility provides tertiary treatment of secondary treated effluent produced from the cities of San Bernardino and Colton wastewater treatment plants. The RIX facility was designed to provide tertiary treatment for 40 MGD of secondary treated effluent through percolation and extraction of treated effluent. However, due to infiltration issues at the existing percolation basins, the RIX facility is not operating at its design capacity. The purpose of this expansion is to return the RIX facility to its original design capacity by adding additional percolation basins and installing a tertiary treatment unit as a backup treatment system for the percolation basins. The proposed project will benefit the cities of Colton and San Bernardino by providing a reliable method of treating wastewater generated within those cities. This project will also benefit water quality in general by providing a reliable method of achieving water quality goals for the Santa Ana River Basin by allowing the RIX facility to comply with its waste discharge requirements.

Contact Information

Name
John Perry
Agency Name
City of San Bernardino Municipal Water Department
Contact Types
Lead/Public Agency

Location

Cities
Colton
Counties
San Bernardino
Cross Streets
Agua Mansa Road and Riverside Avenue
State Highways
I-10
Railways
UPRR
Waterways
Santa Ana River
Township
1S
Range
5W
Section
35, 36
Base
SBM

Notice of Determination

Approving Agency
City of San Bernardino Municipal Water Department
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes