San Diego State University, Aztec Center Student Union, Schematic Plan Approval

9 Documents in Project

Summary

SCH Number
2007021020
Lead Agency
California State University, San Diego (SDSU)
Document Title
San Diego State University, Aztec Center Student Union, Schematic Plan Approval
Document Type
NOD - Notice of Determination
Received
Posted
5/12/2010
Document Description
This project will construct a new replacement facility for the Aztec Center Student Union. The new facility (195,000 GSF) will be located on the site of the existing building, which will be demolished as part of this project. The Aztec Center Student Union occupies a prime location on campus, which serves as the campus gateway to College Avenue and the SDSU Transit Center, and is in close proximity to administrative offices, student services, and housing facilities. This project will provide a significantly larger and more flexible student union to address the need for additional food service areas, expanded student organization spaces, a 300-seat theater, a recreation center, conference and meeting rooms and related support spaces. The proposed building will be constructed on three levels above grade and with a partial basement to best utilize a sloping site and provided universal access at all levels. The building is being designed to achieve LEED Platinum certification.

Contact Information

Name
Lauren Cooper
Agency Name
California State University Trustees
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
College Avenue and Interstate 8
Zip
92182
Total Acres
~ 55
State Highways
I-8

Notice of Determination

Approving Agency
Trustees
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print