Change of Zone No. 6926/Tentative Tract Map No. 31597 (Terracina Project)

3 Documents in Project

Summary

SCH Number
2007021006
Lead Agency
Riverside County
Document Title
Change of Zone No. 6926/Tentative Tract Map No. 31597 (Terracina Project)
Document Type
NOD - Notice of Determination
Received
Posted
7/7/2014
Present Land Use
Vacant / R-R (Rural Residential) / Medium Density Residential (MDR)
Document Description
Construction of single-family houses on 93.5 acres. The development includes 206 residential lots, associated infrastructure and utilities, a sewer lift station, parks and open space, and stream channel impacts. Stream channel impacts include lowering and widening of the existing channel, a combination of earthen and hardened side slopes, access roads, and maintenance ramps. Additionally, two roadway crossings will be constructed for traffic circulation. These crossings consist of a double 10 by 4 foot box culvert at Cebalo Street, and two double 10 by 4 foot box at Woolpert Lane.

Contact Information

Name
Darren Bradford
Agency Name
Riverside County Planning Department
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
North of Anza Road and south of Redhawk Parkway
Total Acres
93.5
Parcel #
917-310-004, 007, 018, 019, 020, 021, 033, 036; 917-26-036, 041
State Highways
79
Township
8S
Range
2W
Section
22
Base
SB
Other Location Info
Via Puebla and Monte Verde Rd.

Notice of Determination

Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print