Palo Verde Ranch HOA Flood Control Maintenance Project (SAA# 1600-2006-0207-R5)

Summary

SCH Number
2007019012
Lead Agency
San Diego County
Document Title
Palo Verde Ranch HOA Flood Control Maintenance Project (SAA# 1600-2006-0207-R5)
Document Type
NOD - Notice of Determination
Received
Posted
1/18/2007
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2006-0207-R5 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Palo Verde Ranch Homeowner's Association. The applicant proposes to alter the lake/stream to remove sediment from the Lago de Viejas Reservoir (LVR) and Palo Verde Reservoir (PVR). Both reservoirs were constructed prior to construction of the Palo Verde Ranch Subdivision as flood control facilities. The proposed project involves the initial removal of approximately 250,000 cubic yards of sediment from the LVR and PVR as well as restoration of the banks and basins to their original contours. Subsequent annual removal activities are proposed for the LVR and PVR at a rate of approximately 25,000 and 100,000 cubic yards, respectively. Maintenance activities will occur during times of no-flow in Viejas Creek and low-flow in the Sweetwater River.

Contact Information

Name
Kelly Fisher
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Regions
Unincorporated

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print